Ask AI
H.R. 9025

Determination of NEPA Adequacy Streamlining Act

Determination of NEPA Adequacy Streamlining Act

This bill requires the Department of Agriculture and the Department of the Interior to use a previously completed environmental assessment or environmental impact statement required under the National Environmental Policy Act of 1969 for a proposed transmission, pipeline, or renewable energy facility project if the proposed project is substantially the same as one addressed in the previous assessment or statement.

Referred to the Subcommittee on Conservation and Forestry.

Rep. Valadao, David G. [R-CA-21](R-CA)Sponsor
1 cosponsor1 R
1cosponsors2committees5actions1related bills
  1. Committee

    Referred to the Subcommittee on Conservation and Forestry.

    Forestry Subcommittee
  2. IntroReferralH11100

    Referred to the Committee on Natural Resources, and in addition to the Committee on Agriculture, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

    Agriculture Committee
  3. IntroReferralH11100

    Referred to the Committee on Natural Resources, and in addition to the Committee on Agriculture, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

    Natural Resources Committee
  4. IntroReferralIntro-H

    Introduced in House

  5. IntroReferral1000

    Introduced in House

Determination of NEPA Adequacy Streamlining Act — Informed