Wildfire Wireless Resiliency Act
Bill journey · stage 2 of 5
Under committee review
What it doesSummary introduced in house (Jun 25, 2020)
Wildfire Wireless Resiliency Act
This bill excludes certain communications facility replacement projects from specified review requirements.
Specifically, the bill excludes from specified environmental and historic preservation review a project that replaces a communications facility damaged by a major disaster or a wildfire and that could reasonably be considered as necessary (1) for recovery from such disaster or emergency, or (2) to prevent or mitigate future disasters or emergencies.
What just happenedJun 25, 2020
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Who’s behind it
- Introduced in HouseJun 25, 2020
- Jun 25, 2020IntroReferralH11100
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Natural Resources Committee - Jun 25, 2020IntroReferralH11100
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Energy and Commerce Committee - Jun 25, 2020IntroReferralIntro-H
Introduced in House
- Jun 25, 2020IntroReferral1000
Introduced in House