Proportional Reviews for Broadband Deployment Act
Bill journey · stage 2 of 5
Under committee review
What it doesSummary introduced in house (Feb 15, 2021)
Proportional Reviews for Broadband Deployment Act
This bill exempts certain wireless facility modification requests from specified review requirements.
Specifically, the bill exempts from specified environmental and historic preservation review any request for modification of an existing wireless tower or base station that involves (1) collocation of new transmission equipment, (2) removal of transmission equipment, or (3) replacement of transmission equipment.
What just happenedFeb 16, 2021
Referred to the Subcommittee on Environment and Climate Change.
Who’s behind it
- Introduced in HouseFeb 15, 2021
- Feb 16, 2021Committee
Referred to the Subcommittee on Environment and Climate Change.
Environment, Manufacturing, and Critical Materials Subcommittee - Feb 15, 2021IntroReferralH11100
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Natural Resources Committee - Feb 15, 2021IntroReferralH11100
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Energy and Commerce Committee - Feb 15, 2021IntroReferralIntro-H
Introduced in House
- Feb 15, 2021IntroReferral1000
Introduced in House