Bill116th CongressFiled Jul 24, 2019Energy
H.R. 3937
To redesignate the facility of the Bureau of Reclamation located at Highway-155, Coulee Dam, WA 99116, as the "Nathaniel 'Nat' Washington Power Plant".
Bill journey · stage 1 of 5
Just introduced
FiledFiled
CommitteeComm.
PassedFloor
Both ChambersBoth
Became LawLaw
What it doesSummary introduced in house (Jul 24, 2019)
This bill designates the Bureau of Reclamation's facility in Coulee Dam, Washington, known as the Third Power Plant, as the Nathaniel "Nat" Washington Power Plant.
What just happenedJun 25, 2020
Subcommittee Hearings Held.
Who’s behind it
Rep. Newhouse, Dan [R-WA-4](R-WA)Sponsor
9 cosponsors7 D2 R
9cosponsors1committees6actions3subjects
- Introduced in HouseJul 24, 2019
- Jun 25, 2020Committee
Subcommittee Hearings Held.
Water, Wildlife, and Fisheries Subcommittee - Aug 8, 2019Committee
Referred to the Subcommittee on Water, Oceans, and Wildlife.
Water, Wildlife, and Fisheries Subcommittee - Jul 24, 2019IntroReferralH11100
Referred to the House Committee on Natural Resources.
Natural Resources Committee - Jul 24, 2019IntroReferralB00100
Sponsor introductory remarks on measure. (CR E980-981)
- Jul 24, 2019IntroReferralIntro-H
Introduced in House
- Jul 24, 2019IntroReferral1000
Introduced in House