To authorize the Secretary of the Interior to amend the Definite Plan Report for the Seedskadee Project to enable the use of the active capacity of the Fontenelle Reservoir.

(Sec. 1) This bill authorizes the Department of the Interior, in cooperation with the state of Wyoming, to amend the Definite Plan Report for the Seedskadee Project (authorized under the Colorado River Storage Project Act) to provide for the study, design, planning, and construction activities that will enable the use of all active storage capacity of Fontenelle Dam and Reservoir, including the placement of sufficient riprap on the upstream face of the dam to allow such storage capacity to be used for authorized project purposes.

Interior may enter into: (1) any contract, grant, cooperative agreement, or other agreement that is necessary to carry out this bill; and (2) contracts with Wyoming for division of any additional active capacity made available under this bill.

Interior must enter into a cooperative agreement with Wyoming for planning, design, related preconstruction activities, and construction of any modification of the Fontenelle Dam, which shall specify the responsibilities of Interior and Wyoming regarding: (1) completing the planning and final design of the modification of the dam, (2) any environmental and cultural resource compliance activities required for the modification of the dam, and (3) the construction of the modification of the dam.

Placed on Senate Legislative Calendar under General Orders. Calendar No. 390.

Rep. Cheney, Liz [R-WY-At Large](R-WY)Sponsor
2committees17actions4related bills4subjects
  1. Calendars

    Placed on Senate Legislative Calendar under General Orders. Calendar No. 390.

  2. Committee

    Committee on Energy and Natural Resources. Reported by Senator Murkowski without amendment. With written report No. 115-235.

    Energy and Natural Resources Committee
  3. Committee14000

    Committee on Energy and Natural Resources. Reported by Senator Murkowski without amendment. With written report No. 115-235.

    Energy and Natural Resources Committee
  4. Committee

    Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.

    Energy and Natural Resources Committee
  5. IntroReferral

    Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

    Energy and Natural Resources Committee
  6. FloorH38310

    Motion to reconsider laid on the table Agreed to without objection.

  7. FloorH37300

    On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 408 - 0 (Roll no. 160). (text: CR H2064)

  8. Floor8000

    Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 408 - 0 (Roll no. 160).(text: CR H2064)

  9. FloorH30000

    Considered as unfinished business. (consideration: CR H2067-2068)

  10. FloorH37220

    At the conclusion of debate, the Yeas and Nays were demanded and ordered. Pursuant to the provisions of clause 8, rule XX, the Chair announced that further proceedings on the motion would be postponed.

  11. FloorH8D000

    DEBATE - The House proceeded with forty minutes of debate on H.R. 648.

  12. FloorH30000

    Considered under suspension of the rules. (consideration: CR H2064-2065)

  13. FloorH30300

    Mr. Tipton moved to suspend the rules and pass the bill.

  14. Committee

    Referred to the Subcommittee on Water, Power and Oceans.

    Water, Wildlife, and Fisheries Subcommittee
  15. IntroReferralH11100

    Referred to the House Committee on Natural Resources.

    Natural Resources Committee
  16. IntroReferralIntro-H

    Introduced in House

  17. IntroReferral1000

    Introduced in House

Apr 25, 201880

(Sec. 1) This bill authorizes the Department of the Interior, in cooperation with the state of Wyoming, to amend the Definite Plan Report for the Seedskadee Project (authorized under the Colorado River Storage Project Act) to provide for the study, design, planning, and construction activities that will enable the use of all active storage capacity of Fontenelle Dam and Reservoir, including the placement of sufficient riprap on the upstream face of the dam to allow such storage capacity to be used for authorized project purposes.

Interior may enter into: (1) any contract, grant, cooperative agreement, or other agreement that is necessary to carry out this bill; and (2) contracts with Wyoming for division of any additional active capacity made available under this bill.

Interior must enter into a cooperative agreement with Wyoming for planning, design, related preconstruction activities, and construction of any modification of the Fontenelle Dam, which shall specify the responsibilities of Interior and Wyoming regarding: (1) completing the planning and final design of the modification of the dam, (2) any environmental and cultural resource compliance activities required for the modification of the dam, and (3) the construction of the modification of the dam.

Mar 15, 201781

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec. 1) This bill authorizes the Department of the Interior, in cooperation with the state of Wyoming, to amend the Definite Plan Report for the Seedskadee Project (authorized under the Colorado River Storage Project Act) to provide for the study, design, planning, and construction activities that will enable the use of all active storage capacity of Fontenelle Dam and Reservoir, including the placement of sufficient riprap on the upstream face of the dam to allow such storage capacity to be used for authorized project purposes.

Interior may enter into: (1) any contract, grant, cooperative agreement, or other agreement that is necessary to carry out this bill; and (2) contracts with Wyoming for division of any additional active capacity made available under this bill.

Interior must enter into a cooperative agreement with Wyoming for planning, design, related preconstruction activities, and construction of any modification of the Fontenelle Dam, which shall specify the responsibilities of Interior and Wyoming regarding: (1) completing the planning and final design of the modification of the dam, (2) any environmental and cultural resource compliance activities required for the modification of the dam, and (3) the construction of the modification of the dam.

Jan 24, 2017

This bill authorizes the Department of the Interior, in cooperation with the state of Wyoming, to amend the Definite Plan Report for the Seedskadee Project (authorized under the Colorado River Storage Project Act) to provide for the study, design, planning, and construction activities that will enable the use of all active storage capacity of Fontenelle Dam and Reservoir, including the placement of sufficient riprap on the upstream face of the dam to allow such storage capacity to be used for authorized project purposes.

Interior may enter into: (1) any contract, grant, cooperative agreement, or other agreement that is necessary to carry out this bill; and (2) contracts with Wyoming for division of any additional active capacity made available under this bill.

Interior must enter into a cooperative agreement with Wyoming for planning, design, related preconstruction activities, and construction of any modification of the Fontenelle Dam, which shall specify the responsibilities of Interior and Wyoming regarding: (1) completing the planning and final design of the modification of the dam, (2) any environmental and cultural resource compliance activities required for the modification of the dam, and (3) the construction of the modification of the dam.

To authorize the Secretary of the Interior to amend the Definite Plan Report for the Seeds… — Informed