Nuclear Plant Decommissioning Act of 2018

Nuclear Plant Decommissioning Act of 2018

This bill amends the Atomic Energy Act of 1954 to require a Nuclear Regulatory Commission (NRC) licensee to submit to the NRC a post-shutdown decommissioning activities report (PSDAR) regarding the shutdown of a nuclear facility. Prior to submitting a PSDAR, a licensee must consult with affected states and localities.

In the state where the nuclear facility is located, the NRC is required to: (1) solicit public comments on a proposed PSDAR; (2) conduct at least two public hearings; and (3) invite the state to file a statement of support, nonsupport, or conditional support for the proposed PSDAR with specific recommendations that could lead to support.

The NRC must determine the adequacy or inadequacy of a proposed PSDAR and issue a decision document accordingly.

Referred to the Subcommittee on Environment.

Rep. Welch, Peter [D-VT-At Large](D-VT)Sponsor
3 cosponsors3 D
3cosponsors1committees4actions1related bills9subjects
  1. Committee

    Referred to the Subcommittee on Environment.

    Environment, Manufacturing, and Critical Materials Subcommittee
  2. IntroReferralH11100

    Referred to the House Committee on Energy and Commerce.

    Energy and Commerce Committee
  3. IntroReferralIntro-H

    Introduced in House

  4. IntroReferral1000

    Introduced in House

Nuclear Plant Decommissioning Act of 2018 — Informed