To extend the deadline for commencement of construction of a hydroelectric project.

(Sec.1)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate the construction license if it is expired.

Became Public Law No: 115-203.

Rep. Griffith, H. Morgan [R-VA-9](R-VA)Sponsor
1committees26actions3related bills7subjects
  1. President

    Became Public Law No: 115-203.

  2. BecameLaw36000

    Became Public Law No: 115-203.

  3. President

    Signed by President.

  4. BecameLaw36000

    Signed by President.

  5. Floor

    Presented to President.

  6. President28000

    Presented to President.

  7. Floor

    Message on Senate action sent to the House.

  8. Floor

    Passed Senate without amendment by Unanimous Consent. (consideration: CR S4810)

  9. Floor17000

    Passed/agreed to in Senate: Passed Senate without amendment by Unanimous Consent.(consideration: CR S4810)

  10. Calendars

    Received in the Senate. Read twice. Placed on Senate Legislative Calendar under General Orders. Calendar No. 137.

  11. FloorH38310

    Motion to reconsider laid on the table Agreed to without objection.

  12. FloorH37300

    On motion to suspend the rules and pass the bill Agreed to by voice vote. (text: CR H4824-4825)

  13. Floor8000

    Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by voice vote.(text: CR H4824-4825)

  14. FloorH8D000

    DEBATE - The House proceeded with forty minutes of debate on H.R. 447.

  15. FloorH30000

    Considered under suspension of the rules. (consideration: CR H4824-4825)

  16. FloorH30300

    Mr. Upton moved to suspend the rules and pass the bill.

  17. CalendarsH12410

    Placed on the Union Calendar, Calendar No. 114.

  18. CommitteeH12200

    Reported by the Committee on Energy and Commerce. H. Rept. 115-170.

    Energy and Commerce Committee
  19. Committee5000

    Reported by the Committee on Energy and Commerce. H. Rept. 115-170.

    Energy and Commerce Committee
  20. Committee

    Subcommittee on Energy Discharged.

    Energy and Commerce Committee
  21. Committee

    Ordered to be Reported by Unanimous Consent.

    Energy and Commerce Committee
  22. Committee

    Committee Consideration and Mark-up Session Held.

    Energy and Commerce Committee
  23. Committee

    Referred to the Subcommittee on Energy.

    Energy, Climate and Grid Security Subcommittee
  24. IntroReferralH11100

    Referred to the House Committee on Energy and Commerce.

    Energy and Commerce Committee
  25. IntroReferralIntro-H

    Introduced in House

  26. IntroReferral1000

    Introduced in House

Jul 23, 201849

(Sec.1)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate the construction license if it is expired.

Jun 28, 201882

(Sec.1)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate the construction license if it is expired.

Jun 12, 201781

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec.1)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate the construction license if it is expired.

Jan 11, 2017

This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate the construction license if it is expired.

To extend the deadline for commencement of construction of a hydroelectric project. — Informed