Ask AI
S. 730

A bill to extend the deadline for commencement of construction of certain hydroelectric projects.

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec.1)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Gathright Hydroelectric Project located in Alleghany County, Virginia, and the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate either construction license if it is expired.

Placed on Senate Legislative Calendar under General Orders. Calendar No. 101.

Sen. Kaine, Tim [D-VA](D-VA)Sponsor
1committees6actions3related bills7subjects
  1. Calendars

    Placed on Senate Legislative Calendar under General Orders. Calendar No. 101.

  2. Committee

    Committee on Energy and Natural Resources. Reported by Senator Murkowski without amendment. With written report No. 115-82.

    Energy and Natural Resources Committee
  3. Committee14000

    Committee on Energy and Natural Resources. Reported by Senator Murkowski without amendment. With written report No. 115-82.

    Energy and Natural Resources Committee
  4. Committee

    Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.

    Energy and Natural Resources Committee
  5. IntroReferral

    Read twice and referred to the Committee on Energy and Natural Resources. (Sponsor introductory remarks on measure: CR S1999)

    Energy and Natural Resources Committee
  6. IntroReferral10000

    Introduced in Senate

May 24, 201780

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec.1)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Gathright Hydroelectric Project located in Alleghany County, Virginia, and the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate either construction license if it is expired.

Mar 27, 2017

This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Gathright Hydroelectric Project located in Alleghany County, Virginia, and the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia.

Additionally, FERC may reinstate either construction license if it is expired.

A bill to extend the deadline for commencement of construction of certain hydroelectric pr… — Informed