H.R. 2828

To extend the deadline for commencement of construction of a hydroelectric project.

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec.1)This bill requires the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Enloe Hydroelectric Project located on the Similkameen River in Okanogan County, Washington.

Additionally, FERC shall reinstate the construction license if it is expired.

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Rep. Newhouse, Dan [R-WA-4](R-WA)Sponsor
2committees12actions7subjects
  1. IntroReferral

    Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

    Energy and Natural Resources Committee
  2. FloorH38310

    Motion to reconsider laid on the table Agreed to without objection.

  3. FloorH37300

    On motion to suspend the rules and pass the bill Agreed to by voice vote. (text: CR H5937)

  4. Floor8000

    Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by voice vote.(text: CR H5937)

  5. FloorH8D000

    DEBATE - The House proceeded with forty minutes of debate on H.R. 2828.

  6. FloorH30000

    Considered under suspension of the rules. (consideration: CR H5937-5938)

  7. FloorH30300

    Mr. Upton moved to suspend the rules and pass the bill.

  8. Committee

    Referred to the Subcommittee on Energy.

    Energy, Climate and Grid Security Subcommittee
  9. IntroReferralH11100

    Referred to the House Committee on Energy and Commerce.

    Energy and Commerce Committee
  10. IntroReferralB00100

    Sponsor introductory remarks on measure. (CR E795-796)

  11. IntroReferralIntro-H

    Introduced in House

  12. IntroReferral1000

    Introduced in House

Jul 18, 201781

(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec.1)This bill requires the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Enloe Hydroelectric Project located on the Similkameen River in Okanogan County, Washington.

Additionally, FERC shall reinstate the construction license if it is expired.

Jun 8, 2017

This bill requires the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Enloe Hydroelectric Project located on the Similkameen River in Okanogan County, Washington.

Additionally, FERC shall reinstate the construction license if it is expired.

To extend the deadline for commencement of construction of a hydroelectric project. — Informed