S. 1142

J. Bennett Johnston Waterway Hydropower Extension Act of 2018

J. Bennett Johnston Waterway Hydropower Extension Act of 2018

(Sec.2)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.

FERC may reinstate the construction license if it is expired.

Held at the desk.

Sen. Cassidy, Bill [R-LA](R-LA)Sponsor
1 cosponsor1 R
1cosponsors1committees16actions1amendments3related bills7subjects
  1. FloorH15000

    Held at the desk.

  2. FloorH14000

    Received in the House.

  3. Floor

    Message on Senate action sent to the House.

  4. Floor

    Passed Senate with an amendment by Unanimous Consent. (text: CR S5869)

  5. Floor17000

    Passed/agreed to in Senate: Passed Senate with an amendment by Unanimous Consent.(text: CR S5869)

  6. Floor

    The committee substitute withdrawn by Unanimous Consent. (consideration: CR S5868-5869)

  7. Floor

    Measure laid before Senate by unanimous consent.

  8. Floor

    By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-311.

    Energy and Natural Resources Committee
  9. Committee14900

    By Senator Murkowski from Committee on Energy and Natural Resources filed written report. Report No. 115-311.

    Energy and Natural Resources Committee
  10. Calendars

    Placed on Senate Legislative Calendar under General Orders. Calendar No. 536.

  11. Committee

    Committee on Energy and Natural Resources. Reported by Senator Murkowski with an amendment in the nature of a substitute. Without written report.

    Energy and Natural Resources Committee
  12. Committee14000

    Committee on Energy and Natural Resources. Reported by Senator Murkowski with an amendment in the nature of a substitute. Without written report.

    Energy and Natural Resources Committee
  13. Committee

    Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.

    Energy and Natural Resources Committee
  14. Committee

    Committee on Energy and Natural Resources Senate Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 115-505.

    Water and Power Subcommittee
  15. IntroReferral

    Read twice and referred to the Committee on Energy and Natural Resources.

    Energy and Natural Resources Committee
  16. IntroReferral10000

    Introduced in Senate

Aug 22, 201835

J. Bennett Johnston Waterway Hydropower Extension Act of 2018

(Sec.2)This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.

FERC may reinstate the construction license if it is expired.

Jul 30, 20181

J. Bennett Johnston Waterway Hydropower Extension Act of 2018

This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.

FERC may reinstate the construction license if it is expired.

May 16, 2017

J. Bennett Johnston Waterway Hydropower Extension Act of 2017

This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana.

The licensee is not required to pay an annual charge for administrative expenses until construction commences.

FERC may reinstate the construction license if it is expired.

J. Bennett Johnston Waterway Hydropower Extension Act of 2018 — Informed