Bill114th CongressFiled Jun 15, 2016Energy
H.R. 5483
To extend the deadline for commencement of construction of a hydroelectric project.
Bill journey · stage 2 of 5
Under committee review
FiledFiled
CommitteeComm.
PassedFloor
Both ChambersBoth
Became LawLaw
What it doesSummary introduced in house (Jun 15, 2016)
This bill authorizes the Federal Energy Regulatory Commission (FERC)to extend by six yearsthe time period during which Okanogan CountyPublic Utility District No. 1is required to commence construction on the Enloe Hydroelectric Project located on the Similkameen River in Okanogan County, Washington.
In addition, FERC is authorized to reinstate the construction license if it is expired.
What just happenedJun 15, 2016
Referred to the House Committee on Energy and Commerce.
Who’s behind it
Rep. Newhouse, Dan [R-WA-4](R-WA)Sponsor
1 cosponsor1 R
1cosponsors1committees4actions7subjects
- Introduced in HouseJun 15, 2016
- Jun 15, 2016IntroReferralH11100
Referred to the House Committee on Energy and Commerce.
Energy and Commerce Committee - Jun 15, 2016IntroReferralB00100
Sponsor introductory remarks on measure. (CR E925)
- Jun 15, 2016IntroReferralIntro-H
Introduced in House
- Jun 15, 2016IntroReferral1000
Introduced in House