A bill to extend the deadline for commencement of construction of a hydroelectric project in the State of Wyoming.

Authorizes the Federal Energy Regulatory Commission (FERC) to extend for three consecutive two-year periods, at the request of the FERC Swift Creek Power Company, Inc. project licensee, the deadline for commencement of construction of hydroelectric project number 1651 in the State of Wyoming.

Referred to the Subcommittee on Energy and Air Quality.

Sen. Thomas, Craig [R-WY](R-WY)Sponsor
2committees12actions6subjects
  1. CommitteeH11000

    Referred to the Subcommittee on Energy and Air Quality.

    Energy Subcommittee
  2. IntroReferralH11100

    Referred to the House Committee on Energy and Commerce.

    Energy and Commerce Committee
  3. FloorH14000

    Received in the House.

  4. Floor

    Message on Senate action sent to the House.

  5. Floor

    Passed Senate without amendment by Unanimous Consent. (consideration: CR S8013-8019; text CR S8017)

  6. Floor17000

    Passed/agreed to in Senate: Passed Senate without amendment by Unanimous Consent.(consideration: CR S8013-8019; text CR S8017)

  7. Calendars

    Placed on Senate Legislative Calendar under General Orders. Calendar No. 472.

  8. Committee

    Committee on Energy and Natural Resources. Reported by Senator Bingaman without amendment. With written report No. 107-195.

    Energy and Natural Resources Committee
  9. Committee14000

    Committee on Energy and Natural Resources. Reported by Senator Bingaman without amendment. With written report No. 107-195.

    Energy and Natural Resources Committee
  10. Committee

    Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.

    Energy and Natural Resources Committee
  11. IntroReferral

    Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S13709)

    Energy and Natural Resources Committee
  12. IntroReferral10000

    Introduced in Senate

Jun 28, 200280
Authorizes the Federal Energy Regulatory Commission (FERC) to extend for three consecutive two-year periods, at the request of the FERC Swift Creek Power Company, Inc. project licensee, the deadline for commencement of construction of hydroelectric project number 1651 in the State of Wyoming.
Dec 19, 200100
Authorizes the Federal Energy Regulatory Commission (FERC) to extend for three consecutive two-year periods, at the request of the FERC Swift Creek Power Company, Inc. project licensee, the deadline for commencement of construction of hydroelectric project number 1651 in the State of Wyoming.